01Incoming Material
Metal purity and stone lots reviewed against the project specification before casting.
Five checkpoints from incoming material to dispatch. Records kept per order.
If a close-set piece fails the leak test, it is rejected, not repaired.
01Metal purity and stone lots reviewed against the project specification before casting.
02Alignment and workmanship checked after casting and preparation.
03Stone security, alignment, spacing and consistency inspected. Close-set: full-dip leak test per piece, humidity test per batch. Open and open-close: movement check on every stone.
04Polish, texture, edges and visible surfaces matched to the approved sample.
05Weight, dimensions, clasps and mechanisms, colour consistency and buyer specification confirmed before packaging and dispatch.
All 22K and 18K gold pieces, with HUID.
IGI certification where applicable, by piece or by lot as agreed in the brief.
Metal purity, stone type and weight stated on the dispatch documentation.
Export or retailer-mandated certificates arranged at brief stage.
Every sample ships with its inspection sheet. Order one and read it.